You’ve priced the cooking equipment, planned the dining room and found a space that looks right.
But where will the kitchen exhaust go? What’s above the restaurant? And what happens when equipment serving your kitchen has to be installed in the parkade below?
Those questions belong in the budget before construction starts.

This article draws on a restaurant project we documented in 2015. The photos show that installation at the time, not the current business or condition of the space. Two challenges from that project illustrate why a restaurant review needs to look beyond the floor plan.
Look above the kitchen
On this project, the proximity of residences above meant the kitchen exhaust needed an ecologizer.
That is more than another item on an equipment list. Before committing to a space, establish where the exhaust can discharge and whether additional treatment will be needed. Then consider where that equipment will fit and how it will be accessed for maintenance.
A kitchen layout can look workable while the exhaust route is still unresolved. Resolve both together.

Look below it, too
The grease interceptor on this project had to be installed in the parkade on structural and seismic supports.
The original case study highlighted an easily overlooked issue: a grease interceptor can weigh thousands of pounds when full. The actual load depends on the selected unit and its contents.
Its location therefore needs more thought than simply finding somewhere it will fit. The support arrangement, pipe routing and access for cleaning all need to be coordinated. If the location is outside the leased premises, the owner’s permission and access arrangements also need to be resolved.

Ask these questions before committing
- Where can the exhaust go? Review the route, discharge location, nearby residences and any treatment equipment with the mechanical engineer.
- Where will the grease interceptor go? Confirm the proposed location, support needs, drainage connections and cleaning access.
- What work extends beyond your premises? Identify roof, parkade and shared-area work early, along with the permissions and coordination it needs.
- What is actually included in the budget? Allow for the installation around the equipment—not just its purchase price.
Review the building before you build the restaurant
The lesson from these photos is not about how the restaurant looked when it opened. It is about the work that had to happen elsewhere in the building to make the kitchen possible.
Before signing a lease or committing to construction, have the proposed use and the building reviewed together. Finding a constraint early gives you a chance to investigate options, understand the cost and decide whether the space suits your plans.
Planning a restaurant? Evolve Mechanical Solutions can help you identify the mechanical questions to resolve before construction.
See the complete 2015 Before & After photo record.